Project Scope

Electrical Pre-commissioning/Commissioning Works

What We Delivered

Project Description

SSE MENA Performed the electrical testing in the below systems

– MV&LV Switchgear

  • Relay protection testing, Secondary injection, primary injection, contact resistance, Hi-Pot test, functional testing, communication SCADA, MTS/ATS, CT&VT testing, signals testing to DCS …

– Power Transformers Testing

  • Power factor / Dissipation factor (tan delta)
  • Transformer Turn Ratio Test / Polarity / Connection Group.
  • Transformer Excitation Current Test.
  • Winding Resistance Test (Static and Dynamic).
  • Short Circuit Test.
  • Insulation Resistance and Polarization Index Test.
  • Frequency Response Analysis (FRA)
  • Analysis of Electrical, Chemical, and Physical Parameters Transformer Oil.
  • Dissolved Gas Analysis for Transformer Oil.
  • Checking Cable Tightening with Torque Wrench.
  • Checking Accessories & Protection System.
  • Checking On Load Tap Changer (OLTC).
  • Checking Motor runs (Insulation Resistance, Winding Resistance, Motor Start and run Current…).

– MV &LV MOTORS

  • Check the tightness of connections.
  • Insulation Resistance Test.
  • Winding Resistance Test.
  • Run Test (Check Direction of Rotation, Run uncoupled/couple measure current, voltage… according to Client’s procedures)

– MV &LV VSD

  • Settings and Logic Configuration According to Vendor documents
  • Functional testing

– UPS SYSTEM

  • Testing according to Vendor Procedures and commissioning Charge/discharge cycle of batteries.

– DC SYSTEM

  • Testing according to Vendor Procedures and commissioning Charge/discharge cycle of batteries.

– EDG

  •  Vendor Assistance during Pre-com/Commissioning